X

Wyoming Air National Guard’s Flight Simulator Project

Cheyenne, WY

June 3rd, 2104 Progress on Flight Simulator Facility in Cheyenne Wyoming.

Work progress to date for the new flight simulator facility includes placing foundation footings, stem walls, and drilled caissons to support the isolated flight simulator pad. All underground utility support infrastructures are also installed.

AVI is the prime consultant for the Wyoming Air National Guard’s Flight Simulator Project.

Please follow the link below for additional information on this project.

http://www.wyomingnews.com/articles/2012/08/13/news/20local_08-13-12.txt

100_2256

They were particularly good working with the contractors. The skillset of the group was particularly strong with civil engineering and road/drainage designs, but not quite as strong in natural channel design principles. – Luke Schultz – Coal Creek Sediment Reduction and Bank Stabilization

 

 

Luke Schultz – Coal Creek Sediment Reduction and Bank Stabilization

AVI personnel working on this project have provided excellent service and good responsiveness. Very much team players and valuable as resources.

Marcia Murdock, AML Project Manager

AVI completed a very good report, detailing multiple surfacing options and developed cost estimates for each option — good job!

Kevin Stogsdill, PE-WYDOT Interstate 80 RECON

I was very impressed by the timely efforts including straightening out the problem R/W survey that had stalled the project for years.

Dan Lyons, PE-WYDOT Veteran Road

AVI is one of our best consultants. They have proven they can handle multiple projects at one time. WYDOT would be hard pressed to give AVI a project they could not handle.

Cliff Spoonemore, PE-WYDOT Snowy Range Road