X

Swan Ranch Rail Park

Cheyenne, WY

Cost:  $5M, Completion Date: August 2014

Granite Peak Development, LLC, Casper, WY

AVI Served as Design Engineer and provided construction staking and assisted with fiber line lowering, site approval for this unique Swan Ranch Industrial Park West Loop Project. Project entailed 22,500 LF of Rail, 400k yds. of site grading. Coordination and Tie in to UPRR Main line. Sub-blast Placement for this industry Track Project.

Christine Kronz, Photographer LLC “Capturing the Treasures of a Lifetime” www.christinekronz.com 307-634-9755

UP_Train 4

They were particularly good working with the contractors. The skillset of the group was particularly strong with civil engineering and road/drainage designs, but not quite as strong in natural channel design principles. – Luke Schultz – Coal Creek Sediment Reduction and Bank Stabilization

 

 

Luke Schultz – Coal Creek Sediment Reduction and Bank Stabilization

AVI personnel working on this project have provided excellent service and good responsiveness. Very much team players and valuable as resources.

Marcia Murdock, AML Project Manager

AVI completed a very good report, detailing multiple surfacing options and developed cost estimates for each option — good job!

Kevin Stogsdill, PE-WYDOT Interstate 80 RECON

I was very impressed by the timely efforts including straightening out the problem R/W survey that had stalled the project for years.

Dan Lyons, PE-WYDOT Veteran Road

AVI is one of our best consultants. They have proven they can handle multiple projects at one time. WYDOT would be hard pressed to give AVI a project they could not handle.

Cliff Spoonemore, PE-WYDOT Snowy Range Road