X

WYOMING AIR NATIONAL GUARD

Cheyenne, WY

Client: Wyoming Air National Guard

The C-130 Squadron Operation Facility consists of two independent facilities: Squadron Operations (Command and Administration, Mission Planning and Briefing, Life Support, and Mission Support) and Survival Equipment Shop (parachutes, flotation equipment, and repair and manufacture of fabric items). The C-130 Squadron Operations Facility is a 38,200 SF, two story building consisting of concrete masonry units at exterior walls and interior structural steel framing, steel bar joists, and steel decking with concrete floors. The facility meets the Air Force Sustainable Design and Development (SDD) Policy and is designed and constructed to meet the Green Building Council’s (USGBC) Leadership in Energy and Environmental Design LEED Green Building Rating System of Silver. Total cost for this project is estimated at $ 6.2 million.

AVI personnel working on this project have provided excellent service and good responsiveness. Very much team players and valuable as resources.

Marcia Murdock, AML Project Manager

AVI completed a very good report, detailing multiple surfacing options and developed cost estimates for each option — good job!

Kevin Stogsdill, PE-WYDOT Interstate 80 RECON

I was very impressed by the timely efforts including straightening out the problem R/W survey that had stalled the project for years.

Dan Lyons, PE-WYDOT Veteran Road

AVI is one of our best consultants. They have proven they can handle multiple projects at one time. WYDOT would be hard pressed to give AVI a project they could not handle.

Cliff Spoonemore, PE-WYDOT Snowy Range Road

I was impressed with your knowledge of the reporting requirements and processes, as well as how well you prepared for the pre-bid meeting and pre-construction meeting.

– Mark Donner P.E., Natural Resources Team Leader/Project Manager, Trihydro Corporation