X

Whiskey Mountain Conservation Camp

The camp was originally founded in the late 1920’s and was bought by the Wyoming Game and Fish Department in the 1957.  The camp hosts different groups throughout the year including those for youth, adult and women.  The project included preservation and reconstruction of historic cabins, demolition of various outbuildings, and construction of a new Dining Hall.  Working with MBA Architects (Lead), and Spiegelburg Construction (CMAR), AVI’s role included the design of a water distribution system, including underground storage and booster station, sanitary sewer collection system, and various exterior grading, flatwork and site desing.  Currently, the project is under construction with AVI completing construction administration duties.  The project is scheduled for completion in the spring of 2018.

They were particularly good working with the contractors. The skillset of the group was particularly strong with civil engineering and road/drainage designs, but not quite as strong in natural channel design principles. – Luke Schultz – Coal Creek Sediment Reduction and Bank Stabilization

 

 

Luke Schultz – Coal Creek Sediment Reduction and Bank Stabilization

AVI personnel working on this project have provided excellent service and good responsiveness. Very much team players and valuable as resources.

Marcia Murdock, AML Project Manager

AVI completed a very good report, detailing multiple surfacing options and developed cost estimates for each option — good job!

Kevin Stogsdill, PE-WYDOT Interstate 80 RECON

I was very impressed by the timely efforts including straightening out the problem R/W survey that had stalled the project for years.

Dan Lyons, PE-WYDOT Veteran Road

AVI is one of our best consultants. They have proven they can handle multiple projects at one time. WYDOT would be hard pressed to give AVI a project they could not handle.

Cliff Spoonemore, PE-WYDOT Snowy Range Road