X

Guernsey Well House

The New Guernsey Well House No. 2 Project consisted of the design of a new well house building, well pump and motor system, and chlorination system at a pre drilled well site in the Town of Guernsey, Wyoming. The new well would supply water to Guernsey’s domestic water distribution system.  The project also included abandoning and capping the old Well No. 2, and installing approximately 700 feet of water main to connect the new well to the Town’s distribution system.  For the project, AVI provided complete construction drawings, project specifications, including specifications for the new well pump and motor, bidding services, and off site construction management.

AVI personnel working on this project have provided excellent service and good responsiveness. Very much team players and valuable as resources.

Marcia Murdock, AML Project Manager

AVI completed a very good report, detailing multiple surfacing options and developed cost estimates for each option — good job!

Kevin Stogsdill, PE-WYDOT Interstate 80 RECON

I was very impressed by the timely efforts including straightening out the problem R/W survey that had stalled the project for years.

Dan Lyons, PE-WYDOT Veteran Road

AVI is one of our best consultants. They have proven they can handle multiple projects at one time. WYDOT would be hard pressed to give AVI a project they could not handle.

Cliff Spoonemore, PE-WYDOT Snowy Range Road

I was impressed with your knowledge of the reporting requirements and processes, as well as how well you prepared for the pre-bid meeting and pre-construction meeting.

– Mark Donner P.E., Natural Resources Team Leader/Project Manager, Trihydro Corporation